O—Hare Global Terminal MEP — FP
Milhouse Engineering & Construction, Inc. is collaborating with Syska Hennessey Group (SHG) on the MEP/FP portion of the O—Hare Global Terminal project. As Milhouse’s second major terminal renovation at O—Hare, the team will be responsible for:
- A mechanical hydronic piping system, including heat exchangers, circulation pumps, and the main utility backbone for the O—Hare remote concourses’’
- Low- and high-temperature water (hot and chilled) for the air-handling units, heat exchangers, and in-floor heating and cooling system’
- A fire protection system, which will include deluge, dry-pipe, clean-agent, and traditional sprinkler systems’
- A fire alarm system’’
- A lightning protection and grounding system’’
- A power distribution design, including a branch circuit and lighting for the OGT Head of House’